Launch of Hybrid Charging for Battery Swapping Stations (BSS) Utilizing Grid Power and a Solar Power System

PT Santomo Green Power Management (Headquarters: Jakarta, President: Shuntaro Yamaguchi, hereinafter “SGPM”) installed the following solar power system (hereinafter “SOLAR”) on the Faculty of Engineering campus at Hasanuddin University (hereinafter “UNHAS”), a leading institution in Eastern Indonesia, in October 2024, based on the agreement signed with UNHAS regarding the implementation of SOLAR.

<SOLAR>

-Solar panels: 5.22kW (580 Wp x 9 units)

-Power conditioner: 5kW

This project represents a vital initiative aimed at promoting renewable energy and reducing greenhouse gas (GHG) emissions, contributing to the advancement of renewable energy usage within Indonesia.

Through this project, SGPM will further promote the provision of environmentally friendly electric motorcycles, expand the BSS network, and work toward the realization of a carbon-neutral society.

Photo: Solar panels and BSS at the UNHAS Faculty of Engineering campus

-For inquiries regarding this matter, please contact:
Santomo Resource Corporation
Email: info@san-tomo.com
Phone: 03-6775-9226 (Tanase)

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top